Arrow graphic pointing to call-to-action

Bonded & Insured

Arrow graphic pointing to call-to-action

State Licensed

🇺🇸 RGV, Texas

Ariston Construction A logo watermark

Remodel

bathroom remodels, walk-in showers & tub conversions across Corpus Christi & the Coastal Bend

Full bathroom rebuilds, walk-in showers and tub-to-shower conversions. The work that decides whether it lasts happens behind the tile, not on it.

arrow, direction, Artboard 33Created by Caesar Rizky Kurniawanfrom the Noun Project

gET yOUR fREE qUOTE

Ariston Construction A logo mark

Ariston construction

Bathroom Remodeling in Corpus Christi, TX

→ Two things fail early in coastal bathrooms, and both are behind the tile: waterproofing and ventilation. Tile is what you see and what gets photographed. It is also the cheapest part of the job to get right and the most expensive part to redo when what is underneath was wrong.

We replace soft substrate rather than tiling over it, waterproof properly before anything decorative goes on, and size ventilation for a room that has to dry in Gulf humidity rather than inland air. If that sounds obvious, it is worth asking any quote you receive whether it includes those three things.

We are based in La Feria and serve Corpus Christi and the Coastal Bend. No Corpus yard, so work here is booked in blocks with a realistic start date.

This page is bathrooms. For kitchens and whole projects see home remodeling in Corpus Christi, and for our full range across South Texas, home remodeling.

Bathroom Remodeling

Down to the studs and back up: layout, plumbing, electrical, substrate, waterproofing, tile, fixtures and ventilation. This is the right scope when the room has taken water over years, when the layout no longer works, or when you have found soft floor near the tub or toilet. The survey tells us which of those you have before anyone prices it.

The most common project we are asked for, and usually the best value in an older home. Converting a tub to a walk-in shower changes the drain position and the waterproofing envelope, so it is not simply a swap. Where accessibility is the reason for the change, say so early, because it affects threshold height, door swing and where the controls sit.

Tile is not waterproof and grout is not waterproof. What keeps water out of the wall is the membrane or board system behind them, and it has to be continuous, including at corners and at the floor-to-wall junction. Most bathrooms we are called to rebuild early failed here, not at the surface.

A bathroom on the coast has to dry in air that is already carrying moisture. An undersized or badly ducted fan leaves damp in the room long after a shower, and that is what grows mould behind fixtures and lifts paint. Ducting matters as much as the fan: venting into a roof space rather than outside moves the problem rather than solving it.

If the floor flexes near the tub or the toilet, something underneath has already taken water. Tiling over it will crack the new tile, usually within a season. We cut it out, find how far it travelled, and replace what is compromised. This is the single most common reason a bathroom quote changes after work starts, which is why we open and look first.

It depends on scope more than on finish. A tub-to-shower conversion in a sound room sits at one end; a full rebuild where the substrate and some framing have taken water sits at the other, and the gap between them is large. We will not quote a number before surveying, and we would be cautious of anyone who does.

Demolition, then what we found gets discussed before anything is ordered. Then rough plumbing and electrical, substrate, waterproofing, and only then tile and fixtures. Each stage has to be dry before the next starts, which in coastal humidity takes longer than the schedule you would use inland. Running crews out of order is how a three-week bathroom becomes a three-month one.

Our yard is in La Feria, not Corpus Christi, so Coastal Bend projects are scheduled in blocks rather than squeezed in same-day. For a bathroom remodel that is rarely a problem, because the job is planned anyway. You will get a start date we can keep. See home remodeling in Corpus Christi if the project is larger than one room.

arrow, direction, Artboard 33Created by Caesar Rizky Kurniawanfrom the Noun Project
Ariston Construction A logo mark

Ariston construction

Bathroom Remodeling Across Corpus Christi

arrow, direction, Artboard 33Created by Caesar Rizky Kurniawanfrom the Noun Project
Ariston Construction A logo mark

Remodeling Service Areas

arrow, direction, Artboard 33Created by Caesar Rizky Kurniawanfrom the Noun Project
Ariston Construction A logo mark

Remodeling Reviews

What customers say about Ariston

Ariston Construction A logo watermark
arrow, direction, Artboard 33Created by Caesar Rizky Kurniawanfrom the Noun Project

the.gallery

Ariston Construction A logo mark

Serving the Rio Grande Valley with
Roofing, Construction & Leveling Services

the.edge

Ariston Construction A logo watermark
Ariston Construction A logo mark

claim your 100% FREE design consultation

no-obligation remodel quotes